Hydraulic Vertical Shores for Rent

United Rentals offers a wide selection of hydraulic vertical shore rentals, including trusted brands like Speed Shore and Pacific Shoring, to support trench walls and prevent cave-ins. These lightweight aluminum vertical shores are ideal for utility pipeline installation, spot repairs and working around existing infrastructure.

For our full list of hydraulic vertical shores for rent, view the items below. For more information,visit our resource section.

Cat Class Code
HVS-0027

17-27 in. Hydraulic Vertical Shore

  • 17-27 in. hydraulic cylinder range
  • 1.5, 3, 5 or 7 ft. rail lengths
  • Single cylinder on 1.5 ft. rail, dual cylinders on longer rails
  • 21-65 lb. shore weight
  • Uses: Ideal for bracing sheeting in narrow trenches and excavations
Cat Class Code
HVS-0036

22-36 in. Hydraulic Vertical Shore

  • 22-36 in. hydraulic cylinder range
  • 1.5, 3, 5 or 7 ft. rail lengths
  • Single cylinder on 1.5 ft. rail, dual cylinders on longer rails
  • 23-70 lb. shore weight
  • Uses: Ideal for bracing sheeting in narrow trenches and excavations
Cat Class Code
HVS-0046

28-46 in. Hydraulic Vertical Shore

  • 28-46 in. hydraulic cylinder range
  • 1.5, 3, 5 or 7 ft. rail lengths
  • Single cylinder on 1.5 ft. rail, dual cylinders on longer rails
  • 25-75 lb. shore weight
  • Uses: Ideal for bracing sheeting in trenches and excavations
Cat Class Code
HVS-0055

34-55 in. Hydraulic Vertical Shore

  • 34-55 in. hydraulic cylinder range
  • 1.5, 3, 5 or 7 ft. rail lengths
  • Single cylinder on 1.5 ft. rail, dual cylinders on longer rails
  • 28-80 lb. shore weight
  • Uses: Ideal for bracing sheeting in trenches and excavations
Cat Class Code
HVS-0064

40-64 in. Hydraulic Vertical Shore

  • 40-64 in. hydraulic cylinder range
  • 1.5, 3, 5 or 7 ft. rail lengths
  • Single cylinder on 1.5 ft. rail, dual cylinders on longer rails
  • 30-89 lb. shore weight
  • Uses: Ideal for bracing sheeting in trenches and excavations
Cat Class Code
HVS-0088

52-88 in. Hydraulic Vertical Shore

  • 52-88 in. hydraulic cylinder range
  • 1.5, 3, 5 or 7 ft. rail lengths
  • Single cylinder on 1.5 ft. rail, dual cylinders on longer rails
  • 36-97 lb. shore weight
  • Uses: Ideal for bracing sheeting in trenches and excavations
Cat Class Code
HVS-0112

76-112 in. Hydraulic Vertical Shore

  • 76-112 in. hydraulic cylinder range
  • 1.5 ft. rail length
  • 1 hydraulic cylinder per shore
  • 50 lb. shore weight
  • Uses: Ideal for bracing sheeting in wide trenches and large excavations
Cat Class Code
HVS-0130

94-130 in. Hydraulic Vertical Shore

  • 94-130 in. hydraulic cylinder range
  • 1.5 ft. rail length
  • 1 hydraulic cylinder per shore
  • 55 lb. shore weight
  • Uses: Ideal for bracing sheeting in wide trenches and large excavations
Cat Class Code
HVS-0144

108-144 in. Hydraulic Vertical Shore

  • 108-144 in. hydraulic cylinder range
  • 1.5 ft. rail length
  • 1 hydraulic cylinder per shore
  • 57 lb. shore weight
  • Uses: Ideal for bracing sheeting in wide trenches and large excavations
Resources

FAQs About Hydraulic Vertical Shores

Also known as Vertishores, hydraulic vertical shores are a vital component of any trench safety system. Our inventory of vertical aluminum hydraulic shoring includes cylinder ranges from 17 to 144 inches and rail lengths from 1.5 to 7 feet. Available in Class 1, Class 2 and Class 3 stability ratings with one or two cylinders per shore, these lightweight systems weigh between 21 and 97 pounds and are easy for your crew to handle and reposition. We offer two-post and three-post configurations to meet specific site and OSHA requirements. From high-production trenching and emergency response to multistory reshoring and structural rehabilitation, hydraulic vertical shores adapt to a wide range of job site demands.

Learn more about hydraulic vertical shores in our FAQ section below.

FAQs
What are the OSHA requirements for vertical shoring?

OSHA requires trenches that are 5-feet deep or more to be protected against cave-ins, and vertical shoring is one of the accepted methods for meeting this requirement. Specific requirements (soil classification, stability class, spacing and installation depth) vary by site conditions and shoring system, so they should be confirmed using the manufacturer's tabulated data and a competent person on-site. For guidance specific to your job site, contact our trench safety experts.

When is it preferable to use vertical hydraulic shores over trench boxes?

Vertical hydraulic shores work best around existing utilities or tight, irregular trench sections where a rigid trench box won't fit. They're also quicker to set up and take down, making them well-suited for spot repairs and shorter excavations. Trench boxes are typically better suited for long, straight runs where crews need to move freely inside the shielded area.

When should vertical shoring be used instead of sloping?

Sloping requires open surface space to cut back trench walls at a safe angle — space that's often unavailable near roadways, property lines or existing structures. Vertical shoring supports trench walls with a much smaller footprint, making it the practical choice whenever site constraints rule out sloping or benching.

Env: Sandbox -> Release Tag: builds/github/2026/967-release-3.36.6--2026_10_14_1729